Provided there is an electronic model in the LIRA software on an electronic medium. The absence of such a model makes the verification of the static calculation impossible and entails the performance of the static calculation in the LIRA software at the cost specified in p. 1120-1123.
The cost-increasing service coefficients* are:
When ordered and fully paid for 19-14 (inclusive) days before the start of the exhibition – 1.5. For all services and rented equipment, except "Project-technical documentation control," "Supervision installation" (when ordered and fully paid for 19-14 (inclusive) days before the start of the exhibition – 2.0).
When ordered and fully paid for 13-02 (inclusive) days before the start of the exhibition – 2.0. For all services and rented equipment, except "Technical suspensions to roof trusses and rental of hanging equipment," "Static calculations," "Project-technical documentation control," "Supervision installation" (when ordered and fully paid for 13-02 (inclusive) days before the start of the exhibition – 2.5), and "Plumbing connections," "Compressed air connection" (starting from 13 (inclusive) days before the start of the exhibition, the service is not ordered).
Starting from 01 (inclusive) days before the start of the exhibition, technical services are not ordered. Note!
Coefficients are applied to the cost of the service and rented equipment.
Note! The cost is valid for the time periods when ordered and fully paid:
- more than 20 (inclusive) days before the start of the exhibition
- 19-14 (inclusive) days before the start of the exhibition
- 13-2 (inclusive) days before the start of the exhibition